
DITS carried out on behalf of Quadrante Servizi srl the assessment in terms of technical feasibility and the related preparation of the supporting documentation for the replacement/modification of n. 2 double English switches and n. 2 simple switches.
The work was divided into the following phases:
Inspection and survey of the areas of the terminal involved in the extraordinary maintenance operations;
Analysis and comparison of the data collected during the inspection with the planimetric layout of the current state in order to verify the feasibility of the planned interventions;
Graphic update of the planimetry with the new configuration;
Drafting of a Technical Report relating to the correct positioning of the new control devices accompanied by specific graphic documents;
Drafting of a document relating to the main activities and materials necessary for the correct performance of the replacement operations of the four switches subject to the intervention.
Job name: Analysis of extraordinary maintenance intervention on the railway infrastructure relating to the replacement of 4 switches in the Verona Quadrante Europa Base Junction.
Year: 2018
Client: Quadrante Servizi S.r.l.
Website: https://www.quadranteservizi.it/