The specialist services involved the study of railway operation, with reference to circulation and the electrical power supply scheme and related sizing, which was developed through 5 activities briefly described below.

  1. Verification of line operation

Simulation of circulation on the line and related line travel diagrams (and therefore operating program) of the extension based on the hypothesis of a new route (plano-altimetric profile and schematic plan) and verification of the current theoretical minimum cadence on the existing line.

  1. Verification of terminal and depot layout

Study of possible alternative configurations to improve the proposed terminus, consisting of a reversal terminal and depot;

  1. Terminal reversal check

Simulation of the extension operation based on the route hypothesis (plano-altimetric profile and schematic plan) and the preliminary and optimal solution identified for the terminus (terminal and depot), which guarantee the current theoretical minimum cadence on the existing line.

  1. Gauge check

Check of the kinematic gauge, limit and maximum lateral deviations for critical sections according to the UNI 7360:2010 Metropolitan standards “Kinematic gauge and limit gauge of rolling stock – Minimum profile of obstacles and spacing between tracks” and UNI 7361:2010 Metropolitan standards “Maximum lateral deviations of rolling stock in motion”;

  1. Electrical power supply check and sizing

Definition of the electrical power supply scheme (ac and dc) and related sizing, based on the route variant and the operating program; electrical simulation; power supply system and management of power supply configurations; MT cable sizing (AC/DC), 20 kV SSE line backbones, MT/LV cabin line; electrical protection system, medium voltage (MT) filtering system, electromagnetic compatibility, earthing systems and stray current monitoring; 20 kV general power supply scheme; SSE Rebibbia intervention phasing; New SSE Rebibbia MT single-line AC electrical scheme; new SSE Rebibbia MT single-line DC electrical scheme; SSE Rebibbia equipment positioning layout; SSE Rebibbia metric calculation; rigid contact line metric calculation; contact line; TE power supply scheme; TE earthing and protection circuits; rigid contact line electrification plan.

Job Name: Specialist engineering services relating to the study of circulation and power supplies as part of the Executive Design for the construction of the extension of line B of the Rome Metro, “Rebibbia-Casal Monastero” section.
Year: 2013
Client: Tecnosistem S.p.A.
Type of work: Consulting and design
Website: http://www.tecnosistemspa.com