Category: OUR JOBS

Cost-Benefit Analysis: “New LNG Storage Port Terminal – South Industrial Canal”

||
The purpose of the study is to develop an economic and financial analysis of the costs and benefits related to the new LNG Storage Port Terminal, in order to...

Alternative measure to the speed limitation for train circulation: Ferrovie Centrali Umbre

||
The consultancy is aimed at drafting a technical interpretation of the Minimum Measure established by ANSF at point “5. Automatic train movement protection system” with Circular No. 9956/2016, making...

Design: analysis for the replacement of switches in the Verona Quadrante Europa Base Junction

||
DITS carried out on behalf of Quadrante Servizi srl the assessment in terms of technical feasibility and the related preparation of the supporting documentation for the replacement/modification of n....

Analysis of vibrations induced by railway transit: Circumvesuviana line

||
DITS s.r.l. was commissioned for the analytical modeling of the superstructure system. The study aims to evaluate and prove, from a theoretical point of view and with an engineering...

Transport Technique: Analysis of the railway network and offer at the Port of Venice

||
The general objective of the consultancy, carried out within the European project INWAPO “Upgrading of Inland Waterway and Sea Ports”, was the construction of an operational tool, indicating short,...

Legal insights about “Analysis of the railway network and offer at the Port of Venice” concerning the INWAPO Project

||
Legal, economic and engineering insights into the results of the “Analysis of the railway network and offer at the Port of Venice” service relating to the INWAPO Project

Development of an application for the dynamic simulation of the behavior of the Tramwave® system ‘bandella’ when the vehicle’s speed varies.

||
DITS S.r.l. has implemented the BANDITS 1.0 software tool (BANdella – Dinamica Infrastruttura TramWave Sistema d’alimentazione) intended for the dynamic analysis of the continuous steel band that allows the...

Assessment of compliance with the RID of the transport of ADR semi-trailers loaded with chlorine on the “Modalohr” wagons of the Alpine Railways.

||
The company Mercitalia Rail S.r.l. transports chlorine in road semi-trailers that comply with the requirements of the ADR (European Agreement concerning the International Carriage of Dangerous Goods by Road),...

Stress tests on the bogie of the Rome Metro C vehicles in operating conditions

||
DITS S.r.l. has carried out on behalf of Hitachi Rail S.p.A. a data acquisition and processing campaign aimed at evaluating the following parameters: loads acting on the head carriage...

Operation and power supplies study for the construction of the extension of the Rome Metro line B, “Rebibbia-Casal Monastero” section

||
The specialist services involved the study of railway operation, with reference to circulation and the electrical power supply scheme and related sizing, which was developed through 5 activities briefly...